YD2200 for Zhejiang Natural Gas Pipeline

The inner diameter of the tunnel is 2.2 meters and the length is 608.2 meters. The pipe jacking starts from the starting shaft, jacks in a downward direction with a slope of 14.5% for 41.7 meters, then jacks along a curve with a radius of 1800 meters for 258.3 meters. After that, it jacks in parallel at the bottom of the riverbed for 20 meters, then jacks along a curve with a radius of 1800 meters for another 258.3 meters, and finally jacks in an upward direction with a slope of 14.5% for 19.9 meters before being received in the receiving shaft.

 

Project Owner:Zhejiang Natural Gas Development Co., Ltd.
Construction Company: Sinopec Shengli Petroleum Engineering & Construction Corporation
Geology: Silt, pebble, gneiss