Project Owner: Suzhou Tap Water Company.
Construction Company: Shanghai Tunnel Engineering Co., Ltd.
Geology: Silty sand.
Engineering Difficulty: Crossing Yangcheng Lake with a single jacking length of 2,600 meters.
Construction time: Stated in September 2019.