NPD3500 Slurry Balance with pebbles for Shu River Water System in Rizhao City

This project transfers the surface water of the Shu River water system to the Rizhao Reservoir. It can effectively relieve the pressure on the domestic and industrial water consumption in Rizhao urban area. It is of great significance for ensuring the safety of urban water supply and promoting the economic and social development. The total tunnel length is 3.913 kilometers.

 

Project Owner: Zhejiang Tunnel Engineering Company
Construction Company: Ningbo Hongkun Municipal
Soil texture: moderately and strongly weathered sandy mud-stone, containing pebbles.

Wear-Resistant Cutter Head

Mud-stone in field